WINNIPEG WEATHER

Pembina Highway to be closed December 29 to January 2 in both directions

The City of Winnipeg will be closing Pembina Highway between Jubilee Avenue and Stafford Street in both directions beginning at 8:00 pm on December 29 until 4:00 am on Tuesday, January 2, 2018, so that construction workers can install bridge girders.

The construction is part of the Southwest Rapid Transit corridor being extended. City officials say that workers will be working around the clock during the closure.

 

[jaw_google_map latitude=”49.853811″ longitude=”-97.152219″ description=”Closed Dec 29 to Jan 2 for bridge construction” zoom=”15″ maptype=”ROADMAP” latitude_origins=”” longitude_origins=”” latitude_destination=”” longitude_destination=”” maptypetravel=”DRIVING” height=”400″ marker=”1″ description_open=”start” controls=”0″ disabledoubleclickzoom=”0″ scrollwheel=”0″ dragable=”0″ waypoint=”0″ g_address=”” ][/jaw_google_map][jaw_clear]

 

Pedestrians will be able to still pass through the area on the east sidewalk. Cyclists will also be allowed through the area by walking their bikes along the east sidewalk.

 

 

-Staff-

 

© 2017 News 4, a DigiPix Media Group company

 

.

 

Share this post:

logo-oxary.png
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore
logo-oxary.png
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore
logo-oxary.png
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore